Kicking Horse, BC Mountain Stats
Formerly a heli-ski operation, resort construction began in fall of 1999 and Kicking Horse opened its doors December 8, 2000. Build-out should be reached in 2010. Kicking Horse is the first entirely new resort to be built in Canada in the last 25 years. An 8-passenger state-of-the-art gondola, the Golden Eagle Express, takes skiers from the village to the top of the mountain and a mountain top restaurant called the Eagle's Eye. A lodge is located in the Gondola Plaza providing ski-in, ski-out accommodations for visitors. The skiing is, as they say, awesome.


VERTICAL:

1,260 metres (4,133 feet)

ELEVATION:

Top of Kicking Horse 2,450 metres (8,033 feet)
Mid-Mountain 1,722 metres (5,646 feet)
Bottom of the lowest chair 1,190 metres (3,900 feet)

RUN TYPES:

106 Runs
Beginner - 20%
Intermediate - 20%
Advanced - 45%
Expert - 15%

LIFTS:

Golden Eagle Express Gondola - 8-Passenger Omega III Gondola cabin - length 3,413 metres (11, 266 feet), Ride Time - 12 mins
Catamount - 4-Passenger fixed grip chairlift


This site is powered by ResLogic. ResLogic's online booking engine provides tour operator software for travel wholesalers. Our Web 2.0 travel engine offers private labeling, inventory managment and Galileo GDS integration with the best SEO Optimizable Travel Website CMS Engine available.